Thailand XINGANG Power Plant project is a new project we undertook in March this year. It is one of the major power plants in the western part of Thailand. The establishment of this power plant is of great significance for easing the electricity shortage in Thailand. Client Seungra acted as the project manager for the general contractor of the engineering company for this project. Found us through our website and were very interested in our Mineral Sizers.
Due to the impact of COVID-19, customers could not come to our company for interviews. Therefore, we held video conferences for many times to conduct factory inspection, discuss technical solutions and answer questions for customers. After many times of communication, customers recognized our professional skills and high-quality service very much. After comparing with many manufacturers at home and abroad, customers think that our plan is the most in line with their needs, so they choose to cooperate with us. But at the same time, customers also put forward high requirements on our product design, production, quality inspection, delivery and other links. To this end, we set up a special project team led by the project manager, together with the technical department, sales department, production department, quality inspection department, after-sales service department and other teams, designated the production schedule, and held technical and project production coordination meetings for many times. Ensure all aspects of customer products.
First of all, our Mineral Sizers in the early stage of the project, we will pay close attention to the raw materials into the factory, grasp the quality of raw materials and products, and carry out the factory inspection. Cutting workshop for cutting, heat treatment, professional robot welding process. The product is beginning to take shape. After nearly a month of production, the production of the main machine was completed, and the assembly team carried out the intense assembly process. The subsequent painting team will carry out professional painting according to the customer's color number requirements. We scheduled foreign high-end motors of Siemens motors, after more than 60 days to arrive in our factory production and transportation for the assembly of commissioning, test and operation, we invite our quality inspection department quality inspection for multiple projects, no-load commissioning process, such as the sale of our products meet factory standards allow the factory, our professional merchandiser contact logistics shipping company for packaging packaging shipments. We Mineral Sizers arrived at the customer site after fifteen days of shipping. Our after sales engineers conduct teleconference mode to provide technical guidance on installation and pre-operation training. At present our Mineral Sizers are running well and stably. Our products are highly rated by our customers.