After long-term operation, the toothed roller of the Mineral Sizer will gradually suffer from tooth wear and deformation due to continuous impact and friction from the materials. This not only reduces the crushing efficiency but also affects the particle size of the finished products. Timely replacement of the toothed roller is the key to ensuring the stable operation of the equipment. In the following, I will guide you step by step through the preparations, disassembly process, installation points, trial operation, and maintenance precautions to complete the replacement of the toothed roller, ensuring both safety and quality of the replacement operation.

 

Mineral Sizer

 

 

Preparations Before Replacement

The preparations before replacing the toothed rollers directly affect the safety and efficiency of the operation. You need to make preparations in five aspects: safety protection, personnel for handling tools, site clearance, inspection of new components, and time planning.

 

 Safety Protection

  • First, cut off the main power supply of the mineral sizer, remove the power plug or turn off the main switch of the distribution box. Make sure to hang a conspicuous sign at the power switch stating "Under Maintenance, Do Not Close Switch" to prevent others from mistakenly powering it on.
  • Loosen the connecting bolts between the mineral sizer and the upstream and downstream conveying equipment (such as Apron Feeders, Belt Conveyors), move the mineral sizer out of its original working position, and create an independent maintenance space to avoid accidental startup of related equipment and causing harm to you or your team members.

 

 Tools And Personnel

  • Tool List: You need to prepare a complete set of disassembly and installation tools, including open-end wrenches, socket wrenches, pneumatic hammers, hex socket sets, torque wrenches, clamp current meters (for subsequent debugging and monitoring), 20-ton lifting equipment (such as cranes, forklifts, etc., check their load-bearing performance in advance), as well as cotton cloth (for wiping oil stains) and wire brushes (for cleaning the surface dirt of the equipment).
  • Personnel Allocation: It is recommended to form a 4-person professional operation team. Clearly define the roles: 1 person with a professional operation certificate to operate the lifting equipment, responsible for lifting and moving the toothed rollers; 2 equipment operators to assist you in disassembling bolts and assembling components; 1 safety officer to supervise the operation process throughout and help you identify potential safety hazards.

 

 Site And Materials

  • Start the equipment's manual rotation function, slowly rotate the toothed rollers, use scrapers or brushes to clean the residual blocky materials on the toothed rollers, then open the maintenance door of the crushing chamber, clean the dust and debris accumulated inside the chamber, to avoid materials falling and injuring you or your team members during disassembly.
  • Dip the equipment surface with a cleaning agent and wipe it with cotton cloth, use a steel wire brush to clean the rust and dirt at the connection points, ensure that the bolts, expansion sleeves, and other components are free of obstructions; at the same time, clean the ground of the operation area, remove obstacles, and reserve at least 1.5 meters wide operation channel and lifting space.

 

 New Toothed Rollers

  • You need to carefully check the model, diameter, length, and pitch of the new toothed rollers, ensuring they are consistent with the design specifications of the original equipment to avoid installation failure due to size mismatch.
  • Check the integrity of the tooth shape on the surface of the new toothed rollers, check if the wear layer has cracks orfall off, confirm the concentricity, flatness of the toothed roller shaft, and whether the accompanying expansion sleeves, bolts, and other connecting components are complete. If any problems are found, replace or supplement them in time.

 

 Time Planning

Based on our previous experience, the time required for replacing the toothed rollers is approximately 6-8 hours, the equipment installation and positioning takes about 2 hours, and the no-load test run takes about 2 hours, totaling approximately 10-12 hours. It is recommended that you formulate an operation schedule in advance, reasonably allocate time for disassembly, installation, and debugging stages, and try to avoid peak production periods to reduce the impact on the production line.

 

Disassembly Of The Old Tooth Roller

The disassembly of the old tooth roller should follow the sequence of "protection first, then transmission, and finally the main body" to avoid damaging the equipment components by forceful disassembly. Ensure that each step of the operation is precise and controllable.

 

 Remove Safety Guard Components

  • First, use a wrench to unscrew the bolts on the outer side of the low-speed end coupling's protective cover, then remove the cover smoothly and place it in the designated area; next, remove the safety cover above the synchronous wheel, be careful to handle it gently to avoid deformation that may affect subsequent installation.
  • You can take photos or make marks to record the installation positions and quantities of the cover bolts, which will facilitate quick alignment during subsequent reinstallation.

 

 Separate The Transmission Connection Structure

  • Remove the low-speed end coupling: Use a torque wrench to gradually loosen the expansion sleeve bolts on the coupling in a diagonal sequence. Once the bolts are completely loosened, use your hands or tools to remove the safety pin inside the coupling, gently shake the coupling to separate it from the gear roller shaft; if there is any resistance, apply a small amount of lubricating oil to assist in the disassembly, and do not use brute force to strike.
  • Remove the synchronous wheel: The synchronous wheel is connected to the gear roller shaft through an expansion sleeve. First, unscrew the retaining bolts on the end of the synchronous wheel, then remove the retaining cover; next, use a special puller tool to clamp on both sides of the synchronous wheel, slowly rotate the tool screw to push the expansion sleeve off the gear roller shaft, and finally, hold the synchronous wheel with both hands and slowly pull it backward along the axial direction of the gear roller shaft until the synchronous wheel is completely detached.

 

 Remove The Axial Fixed Base

  • Locate the base fixing bolts at both ends of the crushing shaft, use a wrench to unscrew them one by one. Pay attention to keeping the bolts and washers, and store them separately according to the disassembly sequence; if the bolts are rusty and difficult to remove, first gently hit the bolt head with an air hammer or soak it in rust remover for 10-15 minutes before attempting to remove.
  • You can cooperate with team members to smoothly move the base away from the equipment body and place it on a padded ground to avoid damaging the sealing parts at the bottom of the base.

 

 Lift And Remove The Old Gear Roller

  • Have the lifting equipment operator cooperate with the ground operator to securely fix the lifting strap or lifting tool at the lifting points of the old gear roller, ensuring the lifting tool is evenly loaded and avoiding the gear roller from tilting.
  • After the safety officer confirms that there are no personnel staying in the lifting area, give the lifting signal. You can assist in observing the position of the gear roller and help the lifting equipment slowly lift the gear roller; once the gear roller is completely detached from the equipment cavity, smoothly move it to the designated storage area, slowly lower it, and support the two ends of the gear roller with wooden blocks to prevent the gear surface from directly contacting the ground and causing wear.

 

 

Installation Of New Tooth Rollers

The installation of the new tooth rollers must strictly control the concentricity and flatness to ensure reliable connection of the transmission components and prevent abnormal operation of the equipment due to installation deviations.

 

Replace Mineral Sizers Toothed Roller Install And Position The New Toothed Roller

  • First, clean the base surface of the equipment installation position and use a level gauge to check the flatness of the installation surface. If there is any deviation, level it by adjusting the spacers.
  • Let the lifting equipment lift the new toothed roller and slowly move it above the installation position. You and the ground operator assist in adjusting the angle of the toothed roller to ensure that the toothed roller shaft is precisely aligned with the shaft hole of the equipment transmission end, with the concentricity error not exceeding 0.1mm. After confirming the position is correct, let the lifting equipment slowly lower the toothed roller and make it land smoothly on the installation base surface.

 

 Reset And Fix The Axial Base

  • According to the records during disassembly, place the base back in its original position, align the bolt holes of the base with those of the equipment body, insert the bolts and initially tighten them in a diagonal sequence; then use a torque wrench to tighten them in accordance with the torque value specified in the equipment manual (usually 300-500N・m, depending on the equipment model) in several stages to ensure the base is firmly fixed without loosening.
  • After installation is completed, shake the toothed roller by hand to check if there is any gap between the base and the toothed roller shaft. If there is any abnormality, re-adjust.

 

 Install The Synchronous Wheel And Coupling

  • Install the synchronous wheel: Apply a small amount of lubricating grease at the installation position of the synchronous wheel on the toothed roller shaft, then put on the expansion sleeve, push the synchronous wheel along the axial direction of the toothed roller shaft until it is completely in contact with the expansion sleeve; then install the cover, tighten the cover bolts, and finally use a torque wrench to tighten the expansion sleeve bolts according to the specified torque in the equipment manual (usually 300-500N・m, depending on the equipment model) in several stages to ensure a tight connection between the synchronous wheel and the toothed roller shaft.
  • Install the low-speed end coupling: Put the coupling on the toothed roller shaft, align the connection holes of the coupling with those of the transmission end, insert the safety pin, then install the expansion sleeve, and tighten the expansion sleeve bolts in a diagonal sequence; during the tightening process, rotate the coupling several times to check for any jamming, ensuring smooth transmission.

 

 Restore The Safety Protection Cover

  • First, install the safety cover of the synchronous wheel, align the bolt holes of the cover, insert the bolts and tighten them; then install the protective cover of the low-speed end coupling, pay attention to the fit between the cover and the equipment body to avoid friction noise during operation.
  • Check the fixation of the cover, gently push the cover with your hand to confirm that it is not loose, ensuring the effective protection function.

 

 

Debugging And Trial Operation

After the installation is completed, you need to conduct multiple stages of debugging and trial operation to verify the effect of the gear roller replacement, identify potential issues, and ensure the stable operation of the equipment in the future.

 

● Initial Mechanical Inspection

  • You manually rotate the new toothed roller to observe whether it rotates smoothly without any jamming or abnormal noise. Check the gap between the toothed roller and the side wall and the bottom crushing rod (if any) of the crushing chamber to ensure it meets the requirements specified in the equipment manual. The usual gap error should not exceed 2mm.
  • Check the tightness of all connecting bolts, with a particular focus on the synchronous wheels, couplings, and the bolts of the machine base. If any looseness is found, promptly retighten it using a torque wrench.

 

● No-Load Test Run Inspection

  • Connect the power supply of the equipment, and after the safety officer confirms the safety of the site, you start the equipment for a no-load test run. The test run time should be no less than 2 hours (consistent with the previous time plan).
  • During the test run, use a clamp-type ammeter to monitor the motor current to ensure it is stable within the rated range. Use a thermometer to measure the bearing temperature every 30 minutes. The normal temperature should not exceed 70℃. At the same time, listen for any abnormal noise from the equipment. If any abnormal noise is detected, stop the machine for inspection immediately.

 

● Load Test Run Verification

  • After the no-load test run is without any abnormalities, conduct the load test run. First, feed a small amount of material into the crushing chamber through the plate feeder to observe the crushing effect and the output particle size. Confirm that there is no "over-crushing" or "excessive particle size" phenomenon. Then, gradually increase the feeding volume to the rated processing capacity of the equipment and continue running for 1-2 hours.
  • During the load test run, regularly check the operating status of the toothed roller and check whether there is oil leakage or abnormal vibration in the transmission components. If any problems are found, stop the machine for adjustment before continuing the test run.

 

● Conclusion And Equipment Reset

  • After the test run is qualified, you cut off the power supply of the equipment, and recheck the connection of all components. Move the crusher back to its original working position, reconnect the pipes or conveyor belts with the upstream and downstream equipment to ensure good sealing and no material leakage.
  • Clean up the tools and debris at the work site, organize the maintenance records, and detail record the replacement time, new toothed roller model, test run parameters, etc., establish an equipment maintenance file; at the same time, clean the working area and restore the site environment.

 

 

Notes And Maintenance Points

Adhering to proper operation procedures and conducting regular maintenance can extend the service life of the toothed rollers, reduce the frequency of replacements, and lower the operating costs of the equipment. These points require your close attention.

 

► Precautions During The Replacement Process

  • Strictly follow the "power-off operation" principle throughout the process. Do not perform any operation with power on. During the hoisting process, no one is allowed to stand under the hoisting equipment. The safety officer must supervise throughout to prevent hoisting accidents.
  • When disassembling and installing, do not directly strike the precision components such as the toothed rollers and synchronous wheels with a hammer. If striking is necessary, place a copper rod or wooden block on the striking area to reduce impact damage.
  • After installing the new toothed rollers, you need to confirm that the rotation direction of the toothed rollers is correct (usually inward rotation). Avoid causing the material to fail to be crushed normally due to incorrect rotation direction.

 

► Daily Maintenance Of Toothed Rollers

  • Regularly check the wear condition of the toothed surface of the toothed rollers. It is recommended that you conduct an appearance inspection once a week and measure the tooth height once a month. When the wear of the tooth height exceeds 30% of the original tooth height, arrange for replacement promptly to avoid affecting the crushing efficiency.
  • Follow the equipment manual requirements to regularly add lubricating oil. Focus on lubricating the toothed roller bearings and synchronous gears. The lubricating oil model should match the equipment conditions. In low-temperature environments, you can choose lubricating oil that is resistant to low temperatures to prevent the lubricating oil from solidifying and affecting the lubrication effect.

 

► Fault Prevention And Handling

  • If the toothed roller gets stuck during operation, you need to immediately stop the machine. Check if there is any foreign object (such as metal blocks) entering the crushing chamber. Clear the foreign object and then try to start again. Do not forcibly start the machine. Avoid deforming the toothed roller shaft.
  • Regularly check the integrity of easily damaged parts such as the expansion sleeve and safety pin. If the expansion sleeve is loose or the safety pin is broken, replace them in time to prevent transmission failure and equipment damage.

 

► Reference For Replacement Cycle

  • The replacement cycle of the toothed rollers should be combined with the material characteristics and operating load. If you are crushing hard materials (such as ores), it is recommended to check once every 6-8 months and replace once every 1-2 years; if crushing softer materials (such as coal), you can extend the replacement cycle appropriately. Usually, replace once every 2-3 years, depending on the actual wear condition.
  • Based on the previous operation time data (approximately 10-12 hours), when planning the replacement operation, reserve sufficient time in advance to avoid operational oversights due to time pressure and ensure the quality and safety of the replacement.

 

No matter you encounter any technical difficulties during the replacement process of the Mineral Sizer's toothed roller - such as deviation in tooth alignment, inability to control the debugging parameters, or customization requirements (like designing toothed roller for specific hardness limestone), or if you want to obtain rapid supply support for spare parts, please feel free to contact us at any time!