What should be paid attention to in the installation of Sidewall belt conveyor

Sep 16, 2022

The Sidewall Belt Belt conveyor installation process is critical to the normal use of this equipment, so much care is required in installation. The following is the installation process of Sidewall Belt conveyor and its notes I have made for you.

1、Foundation retesting and handover acceptance Foundation retesting is the first step in the installation of the sidewall belt conveyor, but also a key step, foundation retesting should be strictly in accordance with the "General specifications for installation of machinery and equipment" acceptance, actual measurement of the level, elevation, center line;

2、The sidewall belt conveyor components inventory and transport in place belt machine components are generally fragmented, including the head frame, tail frame, concave and convex arc section rack, the rest, such as the middle frame, slotted roller frame, rollers, sealing cover quantity, more fragmented, need to be carefully counted. All components should be transported in place after clear count;

sidewall belt conveyor

3、The sidewall belt conveyor of Head and tail frame, concave and convex arc section rack and intermediate frame installation and positioning, welding first, installation by finding the center line of civil construction, to determine the positioning point, and then make a line frame in the head, the use of line drop, through the upper and lower joints at the convex arc, concave line section rack to do auxiliary, with a steel line to do belt positioning center line. When installing, adjusting the head frame, tail frame, concave and convex arc section frame must be subject to the positioning center line, and the deviation is allowed within the specification. The method of roller alignment is shown in the figure, and make detailed records;

4、The sidewall belt conveyor of Belt lifting and laying large inclination belt is no joint whole ring belt, in view of the special nature of the belt, the weight of the belt should be clear when installing, measuring the size of the belt in advance and the actual installation of the belt frame size is consistent, according to the weight and site conditions to choose the crane and wire rope. In order to prevent damage to the belt, seamless steel pipe is used to assist in lifting, and when lifting, the wire rope hangs both ends of the steel pipe. In addition, before lifting the belt, weld the head frame, tail frame, concave and convex arc section rack, and disassemble all the above rack rollers and rollers, after the belt is lifted into place, put the belt into the rollers, and then fasten the bolts and fasteners, the belt laying is completed;

5、After the belt is running and the sidewall belt conveyor belt is adjusted to run away from the belt, the grooved rollers, centering rollers and vertical rollers are installed, and the belt is run from the power supply and the belt is adjusted to run away from the belt;

6、After the sidewall belt conveyor accessories are installed and bolts are tightened, the belt runout is adjusted, and the sealing cover, head guard, bolts are tightened, and oil is polished and brushed;

7、Trial operation of the sidewall belt conveyor, acceptance of the completion of the installation of accessories, re-inspection, bolts, welds, omissions, and finally, the air-load single commissioning, handing over to the A.